When I buy a 50×100 metal building for sale, what should I ask the supplier if I eventually want to add an office or small apartment inside the structure?

Quick Answer

Tell the supplier you plan to finish part of the building later and confirm: clear-span design, mezzanine or second-floor load capacity, higher eave height, framed openings for windows/doors, plumbing/HVAC stub-outs, insulated metal buildings R-values, and county-specific stamped foundation and building plans. That locks in code compliance and avoids costly retrofits.

Detailed Answer

Lay your cards on the table early. Tell us you eventually want an office or small apartment inside the 50×100 bolt-up steel building kit. We then engineer the frame for future occupancy loads (for example, a higher live load for a mezzanine versus simple storage) and keep the interior clear-span for flexible layouts.

1. Structure: Ask for red iron steel building kits with built-in mezzanine or second-floor joist points, plus the eave height you’ll need once ceilings, HVAC drops, and lights go in.

2. Openings: Get framed windows, personnel doors, and rough-ins for plumbing now—torch-cutting later adds time and voids warranties.

3. Energy code: Confirm insulated metal buildings R-values (common 6″ R-19 roof, 4″ R-13 walls) and optional interior liner panels that hide wires fast.

4. Plans & permits: Require county-specific stamped building and foundation plans; TruSteel turns basic sets in about 2–4 weeks, complex builds in 8–16 weeks, so your permit path stays on schedule.

5. Utilities: Ask the concrete team for stub-outs and vapor barrier; mechanical trades can drop ducts once the shell is dry-in.

6. Timeline: Once drawings are approved, materials arrive in roughly four weeks, and our installer network can usually erect a 50×100 in one to two weeks.

Planning these details up front locks in code compliance, keeps the 30-year manufacturer’s warranty intact, and saves thousands in tear-outs later.