General

← Back to FAQ

When I buy a 50×100 metal building for sale, what should I ask the supplier if I eventually want to add an office or small apartment inside the structure?

Quick Answer

Tell the supplier you plan to finish part of the building later and confirm: clear-span design, mezzanine or second-floor load capacity, higher eave height, framed openings for windows/doors, plumbing/HVAC stub-outs, insulated metal buildings R-values, and county-specific stamped foundation and building plans. That locks in code compliance and avoids costly retrofits.

Detailed Answer

Lay your cards on the table early. Tell us you eventually want an office or small apartment inside t...Read Full Answer

What warranty coverage typically applies to the steel building materials and components, and what maintenance is recommended?

Quick Answer

TruSteel backs every red-iron or galvanized steel mini storage building kit—and every larger warehouse or hangar—with a 30-year manufacturer’s warranty on roof and wall panels and the primary columns. Keep that coverage by washing sheets yearly, clearing gutters, and inspecting seals, trim, and door hardware after major storms.

Detailed Answer

Every TruSteel red iron steel building kit—from our steel mini storage building kits and climate-con...Read Full Answer

What regional factors—like wind speed, snow load, and corrosion—should I discuss with my engineer before finalizing a steel building design?

Quick Answer

Ask your engineer/county permit office for the exact design wind speed (mph), exposure category, ground snow load, and corrosion level for your county. Also confirm roof pitch, rain and seismic loads, soil bearing capacity, and any coastal or chemical exposures. TruSteel uses these figures to issue county-specific stamped plans that meet code.

Detailed Answer

Red iron steel building kits gain strength and value only when they’re engineered for local conditio...Read Full Answer

What information do you need to price and engineer a steel building for my site (zip code, openings, finished space, code loads)?

Quick Answer

To quote and engineer a red iron steel building kit we need your zip code to verify snow and wind loads, building width-length-height, roof pitch, framed openings (doors, windows, docks), percentage of finished or climate-controlled space, and any county-specific code loads or special options such as mezzanines or insulation.

Detailed Answer

Red iron steel mini storage building kits, climate-controlled storage building kits, RV and boat sto...Read Full Answer