Office space metal building kits from TruSteel cost significantly less than traditional construction methods. Because everything is pre-engineered and included in your package, you eliminate the risk of expensive change orders and surprise costs. Our metal building systems arrive ready to assemble, reducing labor costs and shortening your construction timeline by weeks or even months.
Steel framing also costs less to maintain than wood structures. You avoid the rot, termite damage, and frequent repairs that drain your budget year after year. The commercial-grade building materials we use are built to last for decades with minimal upkeep.
Embarking on a construction project can seem daunting, but with our dedicated team by your side, it’s a breeze.
From the moment you envision your steel building to the final walk-through, our committed sales representatives are here to guide, support, and ensure a seamless experience from start to finish.
After we receive your quote, your (sales representative, agent, engineer, project leader) will reach back out within 24-72 hours with your 7-page quote including preliminary sketch.
While others drag their feet, we prioritize your time. Requests submitted during business hours often have same day turnaround.
3. Signing and Deposit
Get ready to seal the deal! As soon as it’s confirmed, we’ll send you a buyer’s package via email. All you have to do is sign the paperwork and make the deposit.
4. Planning (2-4 weeks to 8-16 weeks based on complexity)
Get your steel building project done faster, with our streamlined process. Our typical timing for stamped drawings is just 2-4 weeks for basic projects. Even complex projects can be completed in 8-16 weeks.
5. Delivery of Plans
Get your completed drawings delivered right to your door! Once your drawings are finished, you’ll receive digital and hard copies by mail.
6. Plan Review and Approval *
Our sales associate will confirm the drawings with you and once approved, we’ll schedule materials to arrive in about 4 weeks.
*For higher complexity jobs or specialty colors, lead times may be longer. But don’t worry, we’ll keep you informed about the delivery date every step of the way.
7. Payment and Delivery of Materials **
Get ready for on-time delivery with a cashier’s check. No matter how tight the space is, we’ve got you covered with our 53′ trailers or gooseneck options.
**Don’t forget to finish your concrete and gravel before we arrive. Plus, we do ask you to send in job site pictures beforehand.
8. Construction (1 – 2 weeks) ***
Discover our extensive network of skilled installation contractors throughout the United States. Our locally-based professionals are fully licensed, insured, and experienced in the industry.
***Construction time may vary depending on the complexity of the project.
9. Walkthrough
Experience satisfaction firsthand by accompanying your installer on a walk-through of the completed building. We want to make sure that you are getting the most out of your experience.
What’s Included
Invest in the Highest Quality Steel Structure Components
We work exclusively with IAS Accredited steel manufacturers and vendors. All our suppliers are held to the highest standards of product quality and customer service.
Call us for a free quote and discuss our custom options
Stamped Building and Foundation Plans specific to your county
100% Steel Primary & Secondary Framing
Roof & Wall Sheeting
Complete Trim & Closure
Fasteners
Delivery to Site
Construction (based on location)
I am looking for land but don’t know where to start.
Contact your zoning commission for more information about land zoning in your area.
Do you offer financing?
No, we do not offer financing.
What roof options do you carry?
We offer two options for roofing: 24 ga standing seam or 26 ga screw down, available in galvalume or a painted finish. For enhanced moisture and condensation control, a DripX moisture barrier can be applied from the factory.
Do stamped building drawings come with the package?
Yes, if requested, stamped building plans and foundation plans are included specifically for your county for the majority of the USA.
Can you add insulation to my building?
Yes, insulation in the roof and walls can vary depending on your needs. Common sizes are 6” R19 in the roof and 4” R13 in the walls.
What color insulation do you offer?
Our product lineup includes vinyl-backed insulation in both white and black options.
Can you add interior liner panels to my building?
Yes, we can and you can select the color. Interior liner panels also help protect wall insulation.
Do you offer feasibility studies in my area?
We can connect you with reputable companies that specialize in this service.
Can you help install our building?
We can connect you with skilled installers who can either perform the installation for you or provide remote assistance over the phone.
Can I install the building myself?
Yes, these building kits are bolt-up and come pre-cut. If you need help with installing your building we can provide you with preferred installers.
What size lift is needed to unload the building package?
Typically, you will need a 5k lull with forks, a spreader bar, and lifting straps.
Is there wood in your building package?
No, our buildings are 100% steel.
Can you add overhangs?
Yes, we can add overhangs on your buildings to make them have a residential look. Adding soffit under your overhangs can also prevent birds from building nests.
Lightning-Fast Assembly
Get Your Business Operational In Weeks, Not Months
Your pre-engineered metal office buildings arrive on-site, pre-cut and pre-drilled, ready for swift assembly. Our clear plans guide your local contractors, ensuring quick completion without delays. You’ll occupy your new workspace in weeks, not months.
Steel framing bolts together efficiently, minimizing construction time. Weather delays are less of an issue, as steel assembly continues in conditions that halt other methods. Our streamlined process includes stamped drawings that meet local building codes from day one. This avoids revisions, keeping your project on schedule.
Flexible Design Options
Create The Perfect Workspace For Your Team
Buildings offer long term adaptability as your business grows. Need to add a second floor or expand your footprint? Steel construction makes future modifications straightforward and cost-effective. Your initial investment grows with your company rather than becoming a limitation.
Every business has unique needs, and our office building kits adapt to match your specific requirements. You can customize interior layouts, add conference rooms, create open workspaces, or include metal garage areas for equipment storage. The clear-span design gives you maximum flexibility for arranging your space.
Steel construction stands up to extreme weather conditions that damage other building types. Your office space steel building won’t warp, crack, or deteriorate like traditional materials. This durability translates into lower insurance costs and virtually no structural maintenance over the building’s lifetime.
Our commercial building materials come with comprehensive warranties that protect your investment. You get peace of mind knowing your workspace will remain solid and functional for years to come. Metal building systems resist fire, pests, and moisture better than any other construction method.
Partner with TruSteel Buildings
Your Trusted Steel Building Experts
TruSteel Buildings stands apart as the industry leader in office space metal building solutions. Our team guides you through every step, from initial planning to final walkthrough.
Our steel buildings offer long-term value when you choose quality materials and expert engineering. TruSteel’s commitment to superior service and high-quality steel framing systems makes us your ideal partner for creating the perfect workspace.
Ready to build your dream office space? Contact TruSteel Buildings today for your free quote and discover why thousands of businesses trust us for their construction needs.
Ensure your steel building is designed perfectly for your space with our detailed site planning services.
Are There Architectural Options to Make a Steel Building Look Traditional?
Quick Answer
Absolutely. TruSteel lets you skin a rigid steel frame with brick, stone, stucco, or board-and-batten siding; raise the roof pitch; add overhangs, cupolas, dormers, porches, and two-tone wainscot. These options give any metal building authentic farmhouse, colonial, or main-street curb appeal while keeping the strength and low upkeep of steel.
Detailed Answer
The “Boxy Metal Building” Myth Many people picture metal buildings as plain rectangles. In reality,…Read Full Answer
Can I Customize the Size, Color, Roof Style, and Finish of My Steel Building?
Quick Answer
Absolutely. TruSteel lets you set your own building footprint, pick standing-seam or screw-down metal roofs, and choose Galvalume or a full palette of factory-painted colors. Add overhangs, liner panels, insulation, and custom doors or windows so the finished structure matches your workflow and brand.
Detailed Answer
Customizing Your TruSteel Building Every TruSteel kit is engineered to fit your site, your brand, an…Read Full Answer
What ADA and accessibility considerations should I plan for in the office portion of a flex space building?
Quick Answer
Plan for level entries, 48-in doors, 5-ft turning circles, ramps ≤1:12, lever hardware, ADA restrooms with 60-in stalls, and compliant parking and signage. Keep 36-in paths, reachable controls, visual alarms, and optional power-assist doors so every visitor and employee moves independently.
Detailed Answer
Flex-space steel building offices must meet the ADA Standards that apply to any commercial workplace…Read Full Answer
What’s the Difference Between Prefabricated, Pre-Engineered, and Hybrid Steel Buildings?
Quick Answer
Prefabricated buildings use factory-made, often standardized components that bolt together on-site. Pre-engineered metal buildings (PEMBs) are a subset of prefab, but each frame is custom-engineered for the project’s loads, codes, and climate. Hybrid systems blend PEMB main frames with conventional steel, wood, or concrete elements to achieve special spans, finishes, or architectural goals.
Prefabricated buildings use stock, light-gauge parts you cut and fit on-site. Pre-engineered buildings, like TruSteel’s red-iron kits, are custom-engineered to your loads, arrive pre-cut, and bolt together fast. Hybrid systems mix a pre-engineered steel frame with other materials—often cold-form steel or wood—to hit special design, budget, or code goals.
Detailed Answer
Choosing the Right Steel Construction Method Steel construction isn’t one-size-fits-all. Knowing how…Read Full Answer
When I buy a 50×100 metal building for sale, what should I ask the supplier if I eventually want to add an office or small apartment inside the structure?
Quick Answer
Tell the supplier you plan to finish part of the building later and confirm: clear-span design, mezzanine or second-floor load capacity, higher eave height, framed openings for windows/doors, plumbing/HVAC stub-outs, insulated metal buildings R-values, and county-specific stamped foundation and building plans. That locks in code compliance and avoids costly retrofits.
Detailed Answer
Lay your cards on the table early. Tell us you eventually want an office or small apartment inside t…Read Full Answer
Selecting the ideal roof pitch for your metal building kit is an important decision that hinges on a few key considerations. If your area is prone to heavy snowfall, opting for a steeper roof pitch can help snow management. However, it’s important to balance this with the cost implications, as a higher pitch can increase the overall price of your building.
A 0.25:12 roof pitch strikes that perfect balance for most customers. This pitch is not only cost-effective but is as efficient in bearing snow weight as a 6:12 pitch. While a higher pitch can aid in shedding snow more quickly, remember that it comes with a higher cost. Our goal is to help you make an informed choice that aligns with both your environmental needs and budget, ensuring your building is both functional and financially feasible.